Victoria has added a new 100 MW battery energy storage system in the Latrobe Valley, bolstering grid stability and supporting the state’s renewable energy transition.
The Latrobe Valley BESS (Battery
Read More
Victoria signs off on 400MW south-west wind farm
Victoria has approved another major wind project, with the 400-megawatt Mt Fyans Wind Farm set to supply power to almost 250,000 homes in the state’s south-west.
Planning Minister Sonya Kilkenny confirmed
Read More
Read More
Grants drive large-user shift from gas boilers to electrification
The Victorian Government is funding electrification to slash fossil fuel use.
Victoria’s largest horticultural nursery has modelled a switch from gas to high-temperature heat pumps, showing how industrial
Read More
Read More
VicGrid locks in six REZs and offshore wind corridor
Victoria has unveiled its first long-term transmission strategy, outlining how renewable energy zones and grid upgrades will underpin the state’s shift away from coal-fired power.
The 2025 Victorian
Read More
Read More
Rooftop solar supplies 11% of Victoria’s grid
Victoria’s appetite for rooftop solar is reshaping the state’s energy mix, with panels now producing almost 11 per cent of total electricity demand.
Rooftop solar is making a record contribution in
Read More
Read More
Solar, insulation and smart tech boost for public housing
Thousands of NSW social housing tenants are set to benefit from major energy efficiency upgrades, with 2,300 homes to be retrofitted under an $18 million joint program between the Albanese and Minns governments.
The
Read More
Read More
Victorian port operations powered entirely by clean energy certificates
Victoria’s busiest port precinct has plugged directly into the state’s revived public power provider.
Port of Hastings Corporation (PoHC) has switched both its Crib Point and Stony Point operations
Read More
Read More
HumeLink opens to new connections
The gates have been thrown open for 3,000 MW of new renewable generation and storage on Australia’s east coast.
A key section of the $3.3 billion HumeLink transmission project is now open to connection
Read More
Read More
Firming tender to tackle NSW’s future shortfall
New South Wales has launched a new competitive tender for 500 megawatts (MW) of firming capacity, targeting delivery before the forecast shortfall in the summer of 2027–28.
Announced by Energy and Climate
Read More
Read More
Snowy 2.0 builds powerful pathways
Students have completed a school-based traineeship delivered on-site at Snowy 2.0 in Cooma.
Eight Monaro High students have become the first to complete a Certificate II in Supply Chain Operations as part
Read More
Read More