NSW Archives - Ecogeneration https://www.ecogeneration.com.au/category/location/nsw/ The voice for Australia's clean energy industry Thu, 14 Aug 2025 22:14:22 +0000 en-US hourly 1 https://www.ecogeneration.com.au/wp-content/uploads/2023/06/cropped-ECO-Favicon-1-32x32.png NSW Archives - Ecogeneration https://www.ecogeneration.com.au/category/location/nsw/ 32 32 Solar, insulation and smart tech boost for public housing https://www.ecogeneration.com.au/solar-insulation-and-smart-tech-boost-for-public-housing/ Thu, 14 Aug 2025 22:14:22 +0000 https://www.ecogeneration.com.au/?p=23496
Image: Shutterstock

Thousands of NSW social housing tenants are set to benefit from major energy efficiency upgrades, with 2,300 homes to be …

The post Solar, insulation and smart tech boost for public housing appeared first on Ecogeneration.

]]>
Image: Shutterstock
Thousands of NSW social housing tenants are set to benefit from major energy efficiency upgrades, with 2,300 homes to be retrofitted under an $18 million joint program between the Albanese and Minns governments. The
Read More

The post Solar, insulation and smart tech boost for public housing appeared first on Ecogeneration.

]]>
HumeLink opens to new connections https://www.ecogeneration.com.au/humelink-opens-to-new-connections/ Wed, 13 Aug 2025 22:26:16 +0000 https://www.ecogeneration.com.au/?p=23484
Image: Transgrid Group

The post HumeLink opens to new connections appeared first on Ecogeneration.

]]>
Image: Transgrid Group
The gates have been thrown open for 3,000 MW of new renewable generation and storage on Australia’s east coast. A key section of the $3.3 billion HumeLink transmission project is now open to connection
Read More

The post HumeLink opens to new connections appeared first on Ecogeneration.

]]>
Firming tender to tackle NSW’s future shortfall https://www.ecogeneration.com.au/firming-tender-to-tackle-nsws-future-shortfall/ Wed, 30 Jul 2025 22:58:19 +0000 https://www.ecogeneration.com.au/?p=23419
Image: schankz/stock.adobe.com

The post Firming tender to tackle NSW’s future shortfall appeared first on Ecogeneration.

]]>
Image: schankz/stock.adobe.com
New South Wales has launched a new competitive tender for 500 megawatts (MW) of firming capacity, targeting delivery before the forecast shortfall in the summer of 2027–28. Announced by Energy and Climate
Read More

The post Firming tender to tackle NSW’s future shortfall appeared first on Ecogeneration.

]]>
Snowy 2.0 builds powerful pathways https://www.ecogeneration.com.au/snowy-2-0-tafe-builds-powerful-pathways/ Mon, 28 Jul 2025 00:19:31 +0000 https://www.ecogeneration.com.au/?p=23388
Image: Snowy Hydro

The post Snowy 2.0 builds powerful pathways appeared first on Ecogeneration.

]]>
Image: Snowy Hydro
Students have completed a school-based traineeship delivered on-site at Snowy 2.0 in Cooma. Eight Monaro High students have become the first to complete a Certificate II in Supply Chain Operations as part
Read More

The post Snowy 2.0 builds powerful pathways appeared first on Ecogeneration.

]]>
Over 1000 towers rise in nation’s biggest transmission project https://www.ecogeneration.com.au/energyconnect-towers-rise-in-nations-biggest-transmission-project/ Wed, 23 Jul 2025 21:41:10 +0000 https://www.ecogeneration.com.au/?p=23374
Image: Transgrid

The post Over 1000 towers rise in nation’s biggest transmission project appeared first on Ecogeneration.

]]>
Image: Transgrid
Australia’s largest transmission project is surging forward in NSW, with over 70 per cent of the eastern alignment of EnergyConnect now complete. More than 1,600 workers are advancing construction of
Read More

The post Over 1000 towers rise in nation’s biggest transmission project appeared first on Ecogeneration.

]]>
$81 million facility to power bricks with waste-derived gas https://www.ecogeneration.com.au/81-million-facility-to-power-bricks-with-waste-derived-gas/ Sun, 20 Jul 2025 22:53:01 +0000 https://www.ecogeneration.com.au/?p=23355
Image: Holger/stock.adobe.com

The post $81 million facility to power bricks with waste-derived gas appeared first on Ecogeneration.

]]>
Image: Holger/stock.adobe.com
A new $81.4 million bioenergy facility at Horsley Park has been approved to supply green gas to Austral Bricks’ manufacturing kiln. The anaerobic digestion (AD) plant, designed to replace fossil gas
Read More

The post $81 million facility to power bricks with waste-derived gas appeared first on Ecogeneration.

]]>
$5 million charger rollout targets NSW’s dense urban EV gap https://www.ecogeneration.com.au/5-million-charger-rollout-targets-nsws-dense-urban-ev-gap/ Sun, 13 Jul 2025 23:07:19 +0000 https://www.ecogeneration.com.au/?p=23330
Image: MarcoBagnoli Elflaco/stock.adobe.com

The post $5 million charger rollout targets NSW’s dense urban EV gap appeared first on Ecogeneration.

]]>
Image: MarcoBagnoli Elflaco/stock.adobe.com
More than 500 new electric vehicle chargers will be installed across 130 suburbs in NSW under the second round of the state’s EV Kerbside Charging Grants program, with a strong focus on high-density
Read More

The post $5 million charger rollout targets NSW’s dense urban EV gap appeared first on Ecogeneration.

]]>
Sydney seeks all-electric building mandate https://www.ecogeneration.com.au/sydney-seeks-all-electric-building-mandate/ Wed, 25 Jun 2025 23:42:40 +0000 https://www.ecogeneration.com.au/?p=23230
Image: Africa Studio/stock.adobe.com

The post Sydney seeks all-electric building mandate appeared first on Ecogeneration.

]]>
Image: Africa Studio/stock.adobe.com
The City of Sydney will require all new residential buildings to be fully electric from 1 January 2026, with similar rules for large commercial buildings and hotels in 2027. Under the first stage, electric
Read More

The post Sydney seeks all-electric building mandate appeared first on Ecogeneration.

]]>
Valley of the Winds gets rolling https://www.ecogeneration.com.au/valley-of-the-winds-farm-gets-rolling/ Fri, 13 Jun 2025 00:08:15 +0000 https://www.ecogeneration.com.au/?p=23139
Image: ACEN

The post Valley of the Winds gets rolling appeared first on Ecogeneration.

]]>
Image: ACEN
ACEN Australia has secured final approval from the NSW Independent Planning Commission (IPC) to develop its 943MW Valley of the Winds wind farm and 320MW/640MWh battery energy storage system in the state’s
Read More

The post Valley of the Winds gets rolling appeared first on Ecogeneration.

]]>
Newcastle hub to streamline green power moves https://www.ecogeneration.com.au/newcastle-hub-to-streamline-green-power-moves/ Wed, 11 Jun 2025 22:23:12 +0000 https://www.ecogeneration.com.au/?p=23130
Image: Kirill Gorlov/stock.adobe.com

The post Newcastle hub to streamline green power moves appeared first on Ecogeneration.

]]>
Image: Kirill Gorlov/stock.adobe.com
A new $115.5 million logistics precinct at the Port of Newcastle will provide critical support for NSW’s renewable energy rollout, enabling faster and more efficient delivery of large-scale wind and
Read More

The post Newcastle hub to streamline green power moves appeared first on Ecogeneration.

]]>