AEMO says energy market reliability standards can be met, but more work is needed.
The Australian Energy Market Operator (AEMO) has warned that reliability standards hinge on projects being delivered on
Read More
New climate data to enhance energy modelling
Exemplary Energy has released a complete suite of 34-year weather and climate data sets.
The new release expands coverage to 225 Australian sites and aims to close gaps in energy modelling accuracy.
The
Read More
Read More
$500m scheme to build Australian batteries
Australia has launched a $500 million funding program to scale up local battery manufacturing.
The Australian Renewable Energy Agency (ARENA) this week opened applications for the Battery Breakthrough
Read More
Read More
New site to pilot hydrogen transport
A homegrown hydrogen storage breakthrough has been unveiled in Western Australia.
Carbon280 has launched its $16 million Hydrilyte Technology Pilot Plant in Kwinana.
The plant demonstrates a new liquid
Read More
Read More
Trina Storage accelerates BESS growth across Asia-Pacific
Trina Storage, the energy storage division of solar leader Trinasolar, has reached a significant milestone with more than 2.4 gigawatt-hours (GWh) of utility-scale storage capacity under execution across
Read More
Read More
Renewable developer rating scheme to lift standards
A new rating system will subject renewable energy developers to greater scrutiny before they can build projects on regional land.
The government says the scheme will strengthen community confidence and
Read More
Read More
Hybrid microgrid to replace diesel in remote WA town
The Blackstone Hybrid Energy Project has been launched on-Country in the Ngaanyatjarra Lands near the SA and NT borders.
Proponents say Blackstone’s new hybrid solar-battery system will slash diesel
Read More
Read More
$3.5 billion Bass Strait cable plan enters next regulatory phase
The AER is assessing a revised $3.52 billion price tag for Marinus Link’s first stage.
The Australian Energy Regulator (AER) has released Marinus Link Pty Ltd’s (MLPL) revised Stage 1, Part B construction
Read More
Read More
HumeLink opens to new connections
The gates have been thrown open for 3,000 MW of new renewable generation and storage on Australia’s east coast.
A key section of the $3.3 billion HumeLink transmission project is now open to connection
Read More
Read More
Gnarwarre BESS reaches financial close
Samsung C&T has secured the engineering, procurement and construction (EPC) contract for FRV Australia’s largest battery storage project.
The Gnarwarre Battery Energy Storage System [BESS] reached
Read More
Read More