Industry experts say Australia’s clean energy build-out must accelerate to keep pace with the demands of emerging technology sectors such as artificial intelligence.
Discussions have been held at a high-level
Read More
Solar-powered and seriously fast
When the future of sustainable transport hits the road, it looks a lot like this.
Forget cupholders. Ditch the touchscreens. This isn’t your average EV. The Sonnenwagen solar car, designed and built
Read More
Read More
Waratah Super Battery playing world-first protection role
Half of the Waratah Super Battery is now live, providing a critical “shock absorber” function for New South Wales’ high-voltage network.
The first 350MW (700MWh) tranche of the 850MW/1680MWh system
Read More
Read More
Merredin Big Battery to bring SWIS storage
A major battery project in Western Australia is moving ahead this week.
Construction is officially underway on the 100 MW / 400 MWh Merredin Battery Energy Storage System [BESS], a grid‑scale facility
Read More
Read More
Transmission project costs double in new AEMO planning reports
The Australian Energy Market Operator (AEMO) has released a suite of technical reports to kick off modelling for the 2026 Integrated System Plan (ISP).
The release marks the halfway point in the two-year
Read More
Read More
CEFC delivers record $4.7b in clean energy commitments
The Clean Energy Finance Corporation (CEFC) has recorded its most substantial investment year to date, committing $4.7 billion in 2024–25 and catalysing $25.7 billion in total transaction value across
Read More
Read More
Bringing forward long-term value
Developers will benefit significantly from RELA Prepay, a tool enabling them to support one of their most important stakeholders – landowners.
According to the RELA, landowners across Australia are already
Read More
Read More
Decades of wind heritage
Liebherr has been providing the wind energy sector with purpose-designed and manufactured cranes for more than 30 years.
As wind energy continues to evolve, with turbines adhering to the notion of ‘higher,
Read More
Read More
ZendIT rewires wind delivery with live project data
A new AI-driven project platform is targeting the delays and inefficiencies plaguing wind farm construction.
Brisbane startup ZendIT AI has launched what it calls the first project intelligence platform
Read More
Read More
Firming tender to tackle NSW’s future shortfall
New South Wales has launched a new competitive tender for 500 megawatts (MW) of firming capacity, targeting delivery before the forecast shortfall in the summer of 2027–28.
Announced by Energy and Climate
Read More
Read More